=====Lab Closure: Mon Feb 10th, 8a-12n===== |
|||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
Users, The lab will be closed from 8 am to noon on Monday February 10th to facilitate the removal of the JEOL EBL. Please plan accordingly. |
|||
<!-- Description of the RSS feed --> |
|||
'''''Important Announcements''''' |
|||
⚫ | |||
<!-- |
|||
⚫ | |||
The Backend Lab (Rm. 1111) will still be open. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
I will notify everyone when we complete the move and open the lab back up. |
|||
⚫ | |||
Hardware board not starting up, repair in progress. |
|||
⚫ | |||
Peder Lenvik |
|||
===== Au Plating: DOWN ===== |
|||
// [[User:John_d|Demis D. John]] 21:13, 7 February 2025 (UTC) |
|||
Bath damaged, system is down for repair. |
|||
⚫ | |||
===== |
=====Olympus DSX Microscope: Down===== |
||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
ASML Engineers will be on site for the periodic maintenance from November 1 through November 4. |
|||
-- Tony Bosch |
|||
System will be down during this time. |
|||
// [[User: |
// [[User:John_d|Demis D. John]] 20:41, 5 February 2025 (UTC) |
||
===== |
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
EB2 Heated Processing is down |
|||
Please plan your work accordingly. |
|||
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
|||
⚫ | |||
===== |
=====ICP #2 Maint: Complete===== |
||
The MLA has new software - make sure to see the updated operating procedures. |
|||
In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. |
|||
// [[User:John d|John d]] 16:27, 17 October 2022 (PDT) |
|||
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer |
|||
⚫ | |||
⚫ | |||
Nanofiles sync & JobCreator functionality is in the process of being restored. |
|||
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
|||
=====Oxford ALD+Ion Mill: UP===== |
|||
⚫ | |||
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you. |
|||
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time. |
|||
===== NanoFab Job Openings ===== |
|||
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings'''] |
|||
Please use the original tool name on SUM to make all future tool reservations. |
|||
⚫ | |||
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool. |
|||
<!---------- end of Equipment Status ------------> |
|||
<!----------------------------------------------> |
|||
⚫ | |||
⚫ | |||
<!-------------------------------------------- |
|||
Please feel free to email me directly with any questions you may have. |
|||
Thanks |
|||
Bill Millerski |
|||
UCSB |
|||
⚫ | |||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
====== HOW TO ADD ITEMS ====== |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
⚫ | |||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 74: | Line 88: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 21:14, 7 February 2025
Lab Closure: Mon Feb 10th, 8a-12n
Users, The lab will be closed from 8 am to noon on Monday February 10th to facilitate the removal of the JEOL EBL. Please plan accordingly.
The Backend Lab (Rm. 1111) will still be open.
I will notify everyone when we complete the move and open the lab back up.
Peder Lenvik // Demis D. John 21:13, 7 February 2025 (UTC)
Olympus DSX Microscope: Down
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. -- Tony Bosch // Demis D. John 20:41, 5 February 2025 (UTC)
Stepper #3 (ASML DUV) - Maint moved to March 3rd
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)
ICP #2 Maint: Complete
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer
//Demis D. John 02:01, 5 February 2025 (UTC)
Oxford ALD+Ion Mill: UP
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you.
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time.
Please use the original tool name on SUM to make all future tool reservations.
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool.
Please feel free to email me directly with any questions you may have.
Thanks Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down