Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(moved ASML maint higher and increased date)
 
(244 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====EBeam4 Update - Still down=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
EBeam4 will remain down overnight.
<!-- Description of the RSS feed -->
 
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
The new motor arrived as well as the new junction box and new cables.
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.
===== JEOL EBL Seminar: Wed Nov 2, 11:30am =====
 
JEOL USA will be presenting results, specifications, and details about their latest electron beam lithography models – focusing on the 8100FS, the upgrade model for our 6300FS tool currently installed here at UCSB.
 
   
  +
This corrosion inside the box could have contributed to the failure of the old motor.
The presentation will be held in ESB, Room 2001 (upstairs) starting at 11:30am sharp.
 
   
  +
I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.
// [[User:John d|John d]] 08:46, 29 October 2022 (PDT)
 
   
  +
I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.
===== ASML Maintenance: Nov 1st-4th =====
 
ASML Engineers will be on site for the periodic maintenance from November 1 through November 4.
 
System will be down during this time.
 
// [[User:John d|John d]] 08:47, 29 October 2022 (PDT)
 
   
  +
For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.
===== SEM#1: Down =====
 
Hardware board not starting up, repair in progress.
 
// [[User:John d|John d]] 16:01, 27 October 2022 (PDT)
 
   
  +
Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.
===== Au Plating: DOWN =====
 
Bath damaged, system is down for repair.
 
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
 
   
  +
I will send another email when an update is available.
===== E-Beam#2: Heater Down =====
 
EB2 Heated Processing is down
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
 
   
  +
//10:36, 30 May 2024 (PDT)
===== MLA 150 Software Revision =====
 
The MLA has new software - make sure to see the updated operating procedures.
 
In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details.
 
// [[User:John d|John d]] 16:27, 17 October 2022 (PDT)
 
   
===== ASML Up; Network status =====
+
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
  +
We have finished calibrations,
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
Nanofiles sync & JobCreator functionality is in the process of being restored.
 
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
 
   
// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
   
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
===== NanoFab Job Openings =====
 
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
 
   
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
   
  +
=====MA6 TSA is down - Update=====
<!---------- end of Equipment Status ------------>
 
  +
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
The tool remains up for backside alignment and topside exposures that do not require alignment.
   
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
   
 
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
====== HOW TO ADD ITEMS ======
 
   
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 81: Line 90:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 10:36, 30 May 2024

EBeam4 Update - Still down

EBeam4 will remain down overnight.

The new motor arrived as well as the new junction box and new cables.

I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.

This corrosion inside the box could have contributed to the failure of the old motor.

I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.

I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.

For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.

Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.

I will send another email when an update is available.

//10:36, 30 May 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.

The tool remains up for backside alignment and topside exposures that do not require alignment.

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)