Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (blue m update)
(deleted ASML update)
 
(283 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
<!--feedBurner name="UCSBNanofab-Announcements" /-->
<!-- Description of the RSS feed -->
'''''Important Announcements'''''
----
<!--
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.


=====Suss SB6-8E=====
In order for your post to show up correctly, you need to:
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
-->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->


-Aidan
===== Dektak XT in qualification =====
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training.
// [[User:John d|John d]] 10:39, 25 January 2023 (PST)


===== Blue-M oven: Down =====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
BlueM down until further notice.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
Looking into blown fuse issues. Repair in progress.
// [[User:John d|John d]] 10:04, 26 January 2023 (PST)


===== Stepper #1 GCA 6300: maintenance =====
=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:
This tool has been scheduled for maintenance and will be unavailable for the following dates/times:


-Physical card
1-23-23 12:00pm till 1-23-23 5:00pm
1-26-23 8:00am till 1-27-23 8:00am
// [[User:John d|John d]] 15:01, 19 January 2023 (PST)


-Mobile phone via Symmetry App
===== Stepper #2 AUtostep200: maintenance =====
This tool has been scheduled for maintenance and will be unavailable for the following dates/times:


//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)
1-23-23 8:00am till 1-23-23 12:00pm
1-24-23 8:00am till 1-26-23 8:00am
// [[User:John d|John d]] 15:35, 19 January 2023 (PST)


<!--
===== Au Plating: DOWN =====
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Bath damaged, system is down for repair.
In order for your post to show up correctly, you need to:
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====

>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
===== Oxford Cobra ICP Etch =====
-->
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will be shipping the parts we need for repair on Friday. Hopefully they will arrive Monday and the system will be operational Tuesday afternoon. I will update you all if that schedule changes.
<!---------DO NOT EDIT BELOW THIS LINE----------->
// [[User:John d|John d]] 09:50, 26 January 2023 (PST)

<!---------- end of Equipment Status ------------>
<!---------------------------------------------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>
<!--------------------------------------------
<!--------------------------------------------




====== HOW TO ADD ITEMS ======
====== HOW TO ADD ITEMS ======

* You can copy/paste the example below for a new news item.
* You can copy/paste the example below for a new news item.
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 71: Line 46:
===== NanoFab making LN2 icecream =====
===== NanoFab making LN2 icecream =====
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~


************* (end of example) **************
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
---------------------------------------------->
---------------------------------------------->

Latest revision as of 00:45, 7 November 2024

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)