When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<!------------- Equipment Status ----------------> |
|||
-Aidan |
|||
===== JEOL SEM#2: Down ===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
|||
After troubleshooting the system with JEOL we’ve determined that the leak is most likely in the gate valve. JEOL is arranging to have a service engineer be out here early next week. We’ll have an update on Monday. -- Aidan |
|||
⚫ | |||
===== |
=====ICP1 Down===== |
||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
The MLA will be down beginning on Monday 1/30 at 5:30 pm and the tool will be unavailable until around 5 pm the following day (Tuesday 1/31). HIMT needs to have Germany remote into the tool that evening to address the software issues we have been having. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
I will send an email out on Tuesday once the tool is available. |
|||
=====Lab Access Changes: Symmetry App===== |
|||
-Lee |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
// [[User:John d|John d]] 13:46, 27 January 2023 (PST) |
|||
-Physical card |
|||
===== Flip-Chip Bonder repair ===== |
|||
All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony |
|||
// [[User:John d|John d]] 15:05, 27 January 2023 (PST) |
|||
-Mobile phone via Symmetry App |
|||
⚫ | |||
We have fixed the top heater issue and now need to run some pressure and voltage tests. The system will be available Monday late morning if everything looks good. I’ll send out an email once the tool is back up. -- Aidan |
|||
// [[User:John d|John d]] 13:48, 27 January 2023 (PST) |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
===== Dektak XT in qualification ===== |
|||
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. |
|||
// [[User:John d|John d]] 10:39, 25 January 2023 (PST) |
|||
⚫ | |||
===== Blue-M oven: UP ===== |
|||
⚫ | |||
Oven reassembled and tested. |
|||
⚫ | |||
Now available for use. |
|||
⚫ | |||
// [[User:John d|John d]] 00:52, 27 January 2023 (PST) |
|||
⚫ | |||
⚫ | |||
===== Au Plating: DOWN ===== |
|||
⚫ | |||
Bath damaged, system is down for repair. |
|||
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
|||
===== Oxford Cobra ICP Etch ===== |
|||
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will have an engineer here next week (mid week) with the hopes of getting the system operational again. With any luck the system will be released by Friday Feb. 3rd afternoon. |
|||
// [[User:John d|John d]] 15:03, 27 January 2023 (PST) |
|||
<!---------- end of Equipment Status ------------> |
|||
<!----------------------------------------------> |
|||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
====== HOW TO ADD ITEMS ====== |
====== HOW TO ADD ITEMS ====== |
||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
* You must add a user signature at the end of each post via four tildes: |
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 76: | Line 46: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
// ~~~~ |
|||
************* (end of example) ************** |
************* (end of example) ************** |
||
The |
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 00:45, 7 November 2024
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)