Template:Announcements: Difference between revisions
No edit summary |
(deleted ASML update) |
||
(270 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
<!--feedBurner name="UCSBNanofab-Announcements" /--> |
|||
<!-- Description of the RSS feed --> |
|||
'''''Important Announcements''''' |
|||
⚫ | |||
<!-- |
|||
⚫ | |||
=====Suss SB6-8E===== |
|||
⚫ | |||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
-Aidan |
|||
===== GCA Autostep Stepper Is DOWN ===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT) |
|||
The Autostep was EPO'd by a user. The system is down until Monday late afternoon. |
|||
[[User:Silva|Silva]] 14:39, 4 February 2023 (PST) |
|||
===== Flip-Chip Bonder repair ===== |
|||
All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony |
|||
// [[User:John d|John d]] 15:05, 27 January 2023 (PST) |
|||
===== Dektak XT in qualification ===== |
|||
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. |
|||
// [[User:John d|John d]] 10:39, 25 January 2023 (PST) |
|||
===== Au Plating: DOWN ===== |
|||
Bath damaged, system is down for repair. |
|||
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
|||
=====ICP1 Down===== |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<endfeed /> |
|||
<noinclude>[[Category:Templates]]</noinclude> |
|||
⚫ | |||
====== HOW TO ADD ITEMS ====== |
====== HOW TO ADD ITEMS ====== |
||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
Latest revision as of 00:45, 7 November 2024
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)