=====ProbeStation scheduled IT maintenance===== |
|||
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates : |
|||
* 10-30-23 |
|||
* 10-31-23 |
|||
Please plan your work activities accordingly. |
|||
⚫ | |||
===== |
=====Suss SB6-8E===== |
||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
PECVD2 will be going down on Thursday October 19th for replacement of the hoist. |
|||
This will be an all day event starting at 8:00am. |
|||
Please plan accordingly. |
|||
This was originally planned for 10-2, but we had to reschedule due to other equipment down |
|||
-Aidan |
|||
⚫ | |||
⚫ | |||
=====Raith Velion - Tool Up===== |
|||
The y-axis motor has been replaced and the stage is working well now. Tests overnight have been completed with excellent results. I'll check the source and column alignment this morning, the tool will be available from 10am. |
|||
⚫ | |||
- Dan |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
=====Lab Access Changes: Symmetry App===== |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:12, 13 October 2023 (PDT) |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
=====Unaxis ICP-PECVD is UP for Non-GapFill===== |
|||
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available. |
|||
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run. |
|||
Please plan your process accordingly. |
|||
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed. |
|||
-Physical card |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT) |
|||
-Mobile phone via Symmetry App |
|||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
|||
//[[User:Mehalana v|Vraj Mehalana]] |
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
||
===== Dicing Saw Upgrade - Update===== |
|||
The upgrade work on the saw is completed. My plan is to work on updating the SOP and running some more tests tomorrow and Monday. If all goes smoothly I should be ready to start re-training users on Tuesday, so I should be sending out an email some time Monday in regard to the re-training schedule. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT) |
|||
⚫ | |||
EVG finally has our PO. They are scheduled to be here next week, my guess would be Tuesday. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 18 October 2023 (PDT) |
|||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 52: | Line 26: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
<!----------------------------------------------> |
|||
<!------------- Equipment Status ----------------> |
|||
<!---------- end of Equipment Status ------------> |
|||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Latest revision as of 00:45, 7 November 2024
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)