Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
updated DUV flood is UP, deleted old lab shutdown and PECVD maint messages |
mNo edit summary |
||
| (234 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====DUV Flood: UP with new procedure===== |
|||
The new parts have been installed and the tool has been tested. |
|||
=====Christmas Lab Shutdown: Dec 22-25===== |
|||
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page: |
|||
Users, |
|||
To perform annual maintenance, we are planning to have the lab shut down from '''''9 am on Monday December 22 through 9 am Friday December 26th'''''. |
|||
| ⚫ | |||
[[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf DUV_Flood_Expose_SOP_Rev_C.pdf]] |
|||
- Peder Lenvik |
|||
// [[User:John_d |
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC) |
||
=====Announcements moved===== |
|||
=====Stepper #1 (GCA 6300) - Scheduled Maintenance===== |
|||
Please check the announcements in SignupMonkey for equipment notifications. |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
| ⚫ | |||
1-18-24 at 8:00am to 1-18-24 at 6:00pm |
|||
| ⚫ | |||
Bill Millerski |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST) |
|||
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
1-15-24 at 8:00am to 1-17-24 at 6:00pm |
|||
Please plan your processing activities accordingly. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST) |
|||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
|||
=====Lab Access Changes: Symmetry App===== |
|||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
| ⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
||
Latest revision as of 06:39, 3 December 2025
Christmas Lab Shutdown: Dec 22-25
Users, To perform annual maintenance, we are planning to have the lab shut down from 9 am on Monday December 22 through 9 am Friday December 26th.
Please plan accordingly. - Peder Lenvik // Demis D. John 02:03, 27 November 2025 (UTC)
Announcements moved
Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)