Template:Announcements: Difference between revisions
(132 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
Beginning Tuesday January 23rd, we will be pulling gowns and booties for refresh. Please remove all personal items from your suits prior to the week your section will be cleared. |
|||
⚫ | |||
===== |
=====Lab Shutdown: Dec 26 to Jan 3rd===== |
||
EBeam1 will remain down until further notice. I found what may be the root cause of the PLC issues, which is the close/pump momentary button was bad and causing a constant signal to the PLC controller. |
|||
⚫ | |||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
=====ASML Stepper #3: UP===== |
|||
We ran 400 wafers successfully, and focus and alignment is in-spec. System is up. |
|||
// [[User:John_d|Demis D. John]] 07:28, 11 January 2024 (PST) |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
=====DUV Flood: UP with new procedure===== |
|||
The new parts have been installed and the tool has been tested. |
|||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 4 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on [https://wiki.nanofab.ucsb.edu/wiki/DUV_Flood_Expose#Documentation:~:text=Exposure%20System%20Spectra-,Documentation,-%5Bedit%20%7C its Wiki page]. |
|||
// |
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC) |
||
===== |
=====New Gowns in Jan===== |
||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
⚫ | |||
⚫ | |||
1-18-24 at 8:00am to 1-18-24 at 6:00pm |
|||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
-Aidan |
|||
Please plan your processing activities accordingly. |
|||
⚫ | |||
=====ICP1 Down===== |
|||
Bill Millerski |
|||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
|||
The tool will be undergoing maintenance and be unavailable the following dates and times: |
|||
1-15-24 at 8:00am to 1-17-24 at 6:00pm |
|||
Please plan your processing activities accordingly. |
|||
⚫ | |||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
|||
⚫ | |||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
-Mobile phone via Symmetry App |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)