Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(→‎Gowning Refresh: added date to title)
(EBL move update)
 
(165 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====Oxford Cobra: Software bugs=====
=====EBL Move-In: Tues 9-11a=====
Users,
The latest revision of software has several bugs: see email for details. We are working with Oxford to resolve via software upgrade.
// [[User:John_d|Demis D. John]] 10:08, 17 January 2024 (PST)


Thank you for your patience while we moved the new EBL system in.
=====ASML Maintenance: Jan 29th-31st=====
The ASML will be down for periodic preventative maintenance on Jan 29th-Jan31st, please plan your process accordingly.
// [[User:John_d|Demis D. John]] 17:00, 11 January 2024 (PST)


The lab is fully open for use.
=====Gowning Refresh: Jan 23rd=====
Beginning Tuesday January 23rd, we will be pulling gowns and booties for refresh. Please remove all personal items from your suits prior to the week your section will be cleared.
// [[User:John_d|Demis D. John]] 07:28, 11 January 2024 (PST)


Peder Lenvik
=====EBeam#1: UP=====
EBeam1 is UP.
Sr. Facilities Lead
// [[User:John_d|Demis D. John]] 10:07, 17 January 2024 (PST)
// [[User:John_d|Demis D. John]] 23:47, 10 March 2025 (UTC)


=====DUV Flood: UP with new procedure=====
=====MLA150 is UP=====
System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week.
The new parts have been installed and the tool has been tested.
-Lee
//[[User:John_d|Demis D. John]] 20:51, 7 March 2025 (UTC)


=====Stepper #3 (ASML DUV) - Maint Complete =====
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 4 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on [https://wiki.nanofab.ucsb.edu/wiki/DUV_Flood_Expose#Documentation:~:text=Exposure%20System%20Spectra-,Documentation,-%5Bedit%20%7C its Wiki page].
ASML Maintenance is complete, the system is up.
// [[User:John_d|Demis D. John]] 02:18, 7 March 2025 (UTC)


=====RIE #5 Down: Mon March 13th =====
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.


If we complete the job early we will send a follow-up email releasing the system.
=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.


//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC)


=====Lab Access Changes: Symmetry App=====
=====New Gowns: Toolbelts purchases=====
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.


Two vendors for cleanroom belts we are using are listed here, you may request others:
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist.
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack]


// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC)
=====Wafer Bonder, (Suss SB6-8E)=====

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
=====Suss SB6-8E=====
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one.
-Aidan
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


<!--
<!--

Latest revision as of 19:15, 11 March 2025

EBL Move-In: Tues 9-11a

Users,

Thank you for your patience while we moved the new EBL system in.

The lab is fully open for use.

Peder Lenvik

Sr. Facilities Lead // Demis D. John 23:47, 10 March 2025 (UTC)

MLA150 is UP

System will be available at 12:30 today (Fri Mar 7th). No changes to OAF settings but PAF has moved about 10 points positive for focus. We will work on adjusting PAF back to around 0 (on our cal resist) some time next week. -Lee //Demis D. John 20:51, 7 March 2025 (UTC)

Stepper #3 (ASML DUV) - Maint Complete

ASML Maintenance is complete, the system is up. // Demis D. John 02:18, 7 March 2025 (UTC)

RIE #5 Down: Mon March 13th

RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.

If we complete the job early we will send a follow-up email releasing the system.

//Vraj Mehalana 09:46, 21 February 2025 (UTC)

New Gowns: Toolbelts purchases

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.

Two vendors for cleanroom belts we are using are listed here, you may request others:

// Demis D. John 03:34, 3 January 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)