(EB4 up) |
(deleted ASML update) |
||
(111 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====E-Beam #4 (CHA) - UP ===== |
|||
Cry replaced, system ready for use. |
|||
⚫ | |||
===== |
=====Suss SB6-8E===== |
||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
The tool is up, intial film checks show same dep. rates as before. |
|||
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST) |
|||
-Aidan |
|||
⚫ | |||
⚫ | |||
RIE 5 is up except for processes that use SiCl4. |
|||
⚫ | |||
⚫ | |||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
|||
⚫ | |||
⚫ | |||
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
We received most of the chamber assembly replacement parts today. We are still waiting on the lamps and chamber o-rings which are scheduled to be delivered in the next couple of days. Once we have all the parts, we'll start to reassemble the chamber. |
|||
-Physical card |
|||
I'll send out an update in the next 2-3 days. |
|||
Thanks, |
|||
⚫ | |||
=====ICP #1 is down - Update===== |
|||
Replacing the battery on the board did not resolve the tool issue. |
|||
Panasonic has located a replacement board for the tool. From what I gather they need to repair and test it and are hoping to have it ready to ship by the 16th. I'd like to add that there is the possibility that this will not resolve the issue but it is the best path forward at this point. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST) |
|||
=====EBeam3 Planned Maintenance 2/21/24 - 2/22/24===== |
|||
The transfer arm installation has been postponed until next week due to other equipment being down at this time. |
|||
The work is now scheduled for 2/21/24 - 2/22/24. |
|||
Please plan accordingly. |
|||
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST) |
|||
=====Job Opening: Process Engineer===== |
|||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
|||
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
|||
⚫ | |||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
|||
-Mobile phone via Symmetry App |
|||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
|||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
|||
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
|||
<!-- |
<!-- |
Latest revision as of 00:45, 7 November 2024
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)