Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Content deleted Content added
deleted EB4, other tools up. Updated ICP1 and DSE from emails.
deleted xmas shutdown
 
(207 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<startfeed />
=====RIE 5 is up=====
RIE 5 is up except for processes that use SiCl4.


=====Announcements moved=====
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
Please check the <u>[https://signupmonkey.ece.ucsb.edu announcements in SignupMonkey]</u> for equipment notifications.

// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update=====
We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon.
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)

=====ICP #1 is down - Update=====
Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date).
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)

=====EBeam3 Transfer Arm Upgrade - Postponed=====
The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues.

I am waiting to hear back from the manufacturer so at this time I can not reschedule yet.

I will send another notification when everything has been worked out, and I am ready to schedule the installation.

//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)

=====Job Opening: Process Engineer=====
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.

//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)

=====Lab Access Changes: Symmetry App=====
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.

// [[User:John d|John d]] 13:49, 7 November 2023 (PST)

=====Wafer Bonder, (Suss SB6-8E)=====
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)


<!--
<!--

Latest revision as of 19:31, 5 February 2026

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)