=====Lab Shutdown: Dec 26 to Jan 3rd===== |
||
JEOL have applied a temporary fix that after overnite testing has shown to be robust. A full fix will require new boards to arrive from Japan in about a week. |
|||
So feel confident about using the tool in the interim. If any issues, let me know immediately.// [[User:John_d|Demis D. John]] 15:52, 6 August 2024 (PDT) |
|||
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed. |
|||
⚫ | |||
A third party bonder repair company will be out here the week of the 26th. The goal is to install the new top heater and then to do a full PM. If all goes well the tool will be available to use late that week. I’ll send out another email once I have more information. Thanks, Aidan. |
|||
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits. |
|||
⚫ | |||
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH |
|||
=====Unaxis ICP-PECVD Update===== |
|||
Unfortunately the shipment of repaired parts was significantly delayed. I will be installing them and testing on Tuesday. With any luck the system will be available Tuesday evening. |
|||
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC) |
|||
Tony |
|||
=====New Gowns in Jan===== |
|||
⚫ | |||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. |
|||
⚫ | |||
⚫ | |||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
-Aidan |
|||
⚫ | |||
=====ICP1 Down===== |
=====ICP1 Down===== |
Latest revision as of 16:58, 24 November 2024
Lab Shutdown: Dec 26 to Jan 3rd
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH
//Demis D. John 16:55, 24 November 2024 (UTC)
New Gowns in Jan
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for tool belts you can use. // Demis D. John 16:58, 24 November 2024 (UTC)
Suss SB6-8E
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.
-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
The iris scanner has been decommissioned. Please use the card reader which supports:
-Physical card
-Mobile phone via Symmetry App
//Vraj Mehalana 16:59, 14 June 2024 (PDT)