Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(IBD up)
(deleted ASML update)
 
(35 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />

=====ASML: intermittent alignment failures=====
I have determined that the laser used for Alignment is failing, the power is low and it flickers.

We will order a replacement ASAP and schedule an ASML engineering visit to install + calibrate a new one.

In the mean time, I'm sorry to say that you will see intermittent "reject" wafers. Please see email for info on recovering from this error.

// [[User:John_d|Demis D. John]] 18:14, 6 September 2024 (PDT)

=====LAB OPEN=====
House vacuum repair has been completed, lab is open for use.
//[[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT)

=====MLA150: Down=====
Heidelberg engineer is on site working on repair, we will update as we learn more.
// [[User:John_d|Demis D. John]] 12:13, 6 September 2024 (PDT)

=====IBD is UP=====
The IBD is back up.

With Mike Silva's help, the fixture was recovered without having to vent the loadlock/chamber.
// [[User:John_d|Demis D. John]] 20:48, 6 September 2024 (PDT)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
Line 29: Line 6:
-Aidan
-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)


=====EBeam#2: Down=====
Good news is we have repaired and reinstalled the hoist, thanks Mike B. and Bill. I have tested it and everything looks good.

However, the repaired bell jar mount is not sliding down the hoist pole like it should. Since the repair involved some welding to the collar that slides down the hoist pole, we surmise that the concentricity was affected by the heat. The mount is back at the machine shop getting honed out. I should have it back to test late today/early tomorrow but it may have to go back again. Once it is able to slide on properly the tool should be up shortly thereafter.

-Lee // [[User:John_d|Demis D. John]] 14:24, 27 August 2024 (PDT)

=====YES EcoClean: 3kW only=====
I swapped out the RF generator and the tool is working again. I am getting repeated CCP warnings for the 0.7kW recipes so we will need to look into that further.

System is up for 3kW recipes only.

DO NOT run 0.7kW recipes until further notice!!

--
Lee Sawyer//[[User:John_d|Demis D. John]] 11:31, 23 August 2024 (PDT)


=====ICP1 Down=====
=====ICP1 Down=====

Latest revision as of 00:45, 7 November 2024

Suss SB6-8E

When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.

-Aidan //Vraj Mehalana 12:43, 3 September 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//Vraj Mehalana 16:59, 14 June 2024 (PDT)