Template:Announcements: Difference between revisions
(deleted lab closure, lab open) |
|||
(33 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====Lab is OPEN===== |
|||
We completed our work early and the lab is now open for use. |
|||
-- Tony |
|||
//[[User:John_d|Demis D. John]] 22:23, 10 February 2025 (UTC) |
|||
⚫ | |||
E-Beam #2 will be down next Wednesday (10/16) and possibly into Thursday to replace the hoist sensors. This will also reduce the likelihood of future issues with the hoist which we dealt with recently. I will send an email out once the work is completed. |
|||
=====Olympus DSX Microscope: Down===== |
|||
-Lee |
|||
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:23, 10 October 2024 (PDT) |
|||
-- Tony Bosch |
|||
// [[User:John_d|Demis D. John]] 20:41, 5 February 2025 (UTC) |
|||
=====Stepper #3 (ASML DUV) - |
=====Stepper #3 (ASML DUV) - Maint moved to March 3rd===== |
||
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. |
|||
We finished calibrations, tool is up and ready for use. |
|||
Please plan your work accordingly. |
|||
No limit on number of wafers. |
|||
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC) |
|||
⚫ | |||
Input has been set back to port # 1 (right) cassette, outputting to Left cassette (Port #2). // [[User:John_d|Demis D. John]] 17:36, 9 October 2024 (PDT) |
|||
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer |
|||
//[[User:John_d|Demis D. John]] 02:01, 5 February 2025 (UTC) |
|||
=====Oxford ALD+Ion Mill: UP===== |
|||
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you. |
|||
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time. |
|||
Please use the original tool name on SUM to make all future tool reservations. |
|||
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool. |
|||
Please feel free to email me directly with any questions you may have. |
|||
Thanks |
|||
Bill Millerski |
|||
UCSB |
|||
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed. |
|||
I will send out an update once we have one. |
|||
-Aidan |
-Aidan |
||
//[[User: |
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
||
=====ICP1 Down===== |
=====ICP1 Down===== |
||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
=====Lab Access Changes: Symmetry App===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT) |
|||
<!-- |
<!-- |
Latest revision as of 22:23, 10 February 2025
Lab is OPEN
We completed our work early and the lab is now open for use. -- Tony
//Demis D. John 22:23, 10 February 2025 (UTC)
Olympus DSX Microscope: Down
After speaking with Olympus it looks like there is a problem with the polarizer that is interfering with basic system initialization. I'm waiting for the repair quote and will update everyone when we know more. -- Tony Bosch // Demis D. John 20:41, 5 February 2025 (UTC)
Stepper #3 (ASML DUV) - Maint moved to March 3rd
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd. Please plan your work accordingly. // Demis D. John 19:44, 4 February 2025 (UTC)
ICP #2 Maint: Complete
The maintenance is completed and the tool is finishing up an O2 clean run. We are still seeing a 0.04-0.05 Pa actual pressure difference in the software (as before the maint work) which we will address tomorrow, as the tool needs time to reach base pressure. -- Lee Sawyer
//Demis D. John 02:01, 5 February 2025 (UTC)
Oxford ALD+Ion Mill: UP
The tool is useable and in its original condition. If you had a reservation under the previous tool designation it has already been moved over for you.
Chamber 1 is operational and available for use. However, only recipes that run at 300C are to be ran on the tool, as the current thermocouple is only calibrated for that temperature at this time.
Please use the original tool name on SUM to make all future tool reservations.
There is no longer a need for supplemental training. If you have been previously trained on the tool but not received the supplemental training, you can once again reserve and use the tool.
Please feel free to email me directly with any questions you may have.
Thanks Bill Millerski UCSB //Demis D. John 19:48, 4 February 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)