===== Raith EBL Update =====
Unfortunately the fix discussed in the last update turned out to be a good news/bad news thing. The good news is that the majority of the field distortion problem we have experienced since the install has been addressed. However the bad news is that there is still a residual settling effect that is distorting the field in one part of the field only and prevents the tool from fully meeting specifications. So it turned out to a layers of an onion kind of thing – because of course it did.


So the suspect now is the fine focus coil in the column (one of the factory engineers predicted stitch shifts when a faulty fine focus coil is present which essentially replicated the errors we are now seeing) and the question now is how to get one of these sent to UCSB. They are a factory install item so for us to get one, and one that has been tested and confirmed to be fully operational, would require it to be taken from a tool currently under fabrication on the production line.
=====Lab Shutdown: Dec 26 to Jan 3rd=====


We are close, very close, but still not quite there. And I am really sorry that is still the case…
We will be shutting down the lab for year end maintenance activities at 7am December 26th. The current plan is to open back up at 7am on January 3rd. We will update the schedule if needed.
-Bill
// [[User:John_d|Demis D. John]] 22:53, 13 June 2025 (UTC)


===== SignupMonkey + Wiki: Off-Campus Access=====
During the shutdown this year we will be pulling all cleanroom suits and stocking new suits.
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.


If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
PLEASE REMOVE ALL PERSONAL ITEMS FROM THE GOWNING ROOM PRIOR TO DECEMBER 26TH


https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
//[[User:John_d|Demis D. John]] 16:55, 24 November 2024 (UTC)


-- Vraj
=====New Gowns in Jan=====
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)
Note we are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom packs/tool belts. Please ask staff for tool belts you can purchase.
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC)


=====Suss SB6-8E=====
=====Suss SB6-8E=====
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
When the vendor came in to install the new top heater he wasn't able to get the z-axis (elevator motor) to move. He was able to install the new heater and do a PM on the rest of the tool. We are ordering a new z-axis controller on the recommendation of the vendor. If all goes well this should solve the issue and make the bonder fully operational. I'll send out an email once the new controller has been installed.


I will send out an update once we have one.
-Aidan
-Aidan
//[[User:Mehalana v|Vraj Mehalana]] 12:43, 3 September 2024 (PDT)
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC)


=====ICP1 Down=====
=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)

=====Lab Access Changes: Symmetry App=====
The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//[[User:Mehalana v|Vraj Mehalana]] 16:59, 14 June 2024 (PDT)


<!--
<!--

Latest revision as of 22:53, 13 June 2025

Raith EBL Update

Unfortunately the fix discussed in the last update turned out to be a good news/bad news thing. The good news is that the majority of the field distortion problem we have experienced since the install has been addressed. However the bad news is that there is still a residual settling effect that is distorting the field in one part of the field only and prevents the tool from fully meeting specifications. So it turned out to a layers of an onion kind of thing – because of course it did.

So the suspect now is the fine focus coil in the column (one of the factory engineers predicted stitch shifts when a faulty fine focus coil is present which essentially replicated the errors we are now seeing) and the question now is how to get one of these sent to UCSB. They are a factory install item so for us to get one, and one that has been tested and confirmed to be fully operational, would require it to be taken from a tool currently under fabrication on the production line.

We are close, very close, but still not quite there. And I am really sorry that is still the case… -Bill // Demis D. John 22:53, 13 June 2025 (UTC)

SignupMonkey + Wiki: Off-Campus Access

Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj // Demis D. John 20:08, 22 April 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)