Template:Announcements: Difference between revisions
(holography update) |
mNo edit summary |
||
(49 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
===== |
===== SignupMonkey + Wiki: Off-Campus Access===== |
||
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website, including both the Nanofab Wiki and Signupmonkey, except for users '''on campus using UCSB Wi-Fi or LAN'''. |
|||
If you are off-campus, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab: |
|||
All suits have been pulled and clean sheets have been put up. All personal items left behind can be found in the boxes in the lobby. |
|||
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn |
|||
Please sign up for your hanger spot. |
|||
This is hopefully a temporary solution, we will implement other remedies next week. |
|||
THE LAB IS NOW OPEN FOR BUSINESS |
|||
-- Vraj |
|||
Thank you for your patience during shutdown activities. |
|||
⚫ | |||
-- [[Peder Lenvik]] |
|||
⚫ | |||
⚫ | |||
The computer is not coming up, after the campus-wide power outage last week. Will continue to work on it next week. |
|||
⚫ | |||
===== |
=====Fluorine ICP: UP===== |
||
We finally got the slit valve assemble to seal correctly after making a number of mechanical adjustments. The tool is currently running an O2 clean and should be available to use within the next 10-15 minutes. Please let us know if you encounter any issues. The load lock seems like it's taking a while to get down to 0mT but that could just be a product of being open for the past several days. |
|||
⚫ | |||
// [[User:John_d|Demis D. John]] 16:58, 24 November 2024 (UTC) |
|||
Thanks, |
|||
⚫ | |||
The vendor (Oxford) will be on site Tuesday the 10th until Friday the 13th to address various issues with this tool and it will be unavailable for use. -- Millerski |
|||
⚫ | |||
Aidan |
|||
=====Holography/PL: HeCd Laser Down Mon Dec 16th===== |
|||
// [[User:John_d|Demis D. John]] 06:39, 3 April 2025 (UTC) |
|||
The 325nm UV Laser will be unavailable from Mon. Dec 16th, through the christmas shutdown, and will be available again soon after Monday Jan 6th. |
|||
We will be installing the refurbished laser which will have higher output power. |
|||
=====EVG - Scheduled downtime===== |
|||
Holography will be unavailable during this time, but all other PL lasers will be available. |
|||
I am looking at sending that generator on the week of March 24th or 31st. It should not take that long, but I would plan for it to be down for 3 weeks. |
|||
⚫ | |||
Please let me know if this does not work for you or if you prefer one week over the other. |
|||
-Lee |
|||
⚫ | |||
=====Raith Velion UP===== |
|||
Raith service have replaced the interferometer laser, and the system is pumping down overnight. I'll run calibrations and checks tomorrow and expect the Velion to be open for general use on Wednesday morning. |
|||
--Dan |
|||
//[[User:Mehalana v|Vraj Mehalana]] 22:27, 1 April 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
⚫ | |||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
⚫ | |||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
Line 39: | Line 57: | ||
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
=====Lab Access Changes: Symmetry App===== |
|||
The iris scanner has been decommissioned. Please use the card reader which supports: |
|||
-Physical card |
|||
-Mobile phone via Symmetry App |
|||
⚫ | |||
<!-- |
<!-- |
Latest revision as of 15:24, 5 April 2025
SignupMonkey + Wiki: Off-Campus Access
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website, including both the Nanofab Wiki and Signupmonkey, except for users on campus using UCSB Wi-Fi or LAN.
If you are off-campus, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
This is hopefully a temporary solution, we will implement other remedies next week.
-- Vraj // Demis D. John 03:41, 5 April 2025 (UTC)
Unaxis Dep: DOWN
The computer is not coming up, after the campus-wide power outage last week. Will continue to work on it next week. // Demis D. John 11:00, 4 April 2025 (UTC)
Fluorine ICP: UP
We finally got the slit valve assemble to seal correctly after making a number of mechanical adjustments. The tool is currently running an O2 clean and should be available to use within the next 10-15 minutes. Please let us know if you encounter any issues. The load lock seems like it's taking a while to get down to 0mT but that could just be a product of being open for the past several days.
Thanks,
Aidan // Demis D. John 06:39, 3 April 2025 (UTC)
EVG - Scheduled downtime
I am looking at sending that generator on the week of March 24th or 31st. It should not take that long, but I would plan for it to be down for 3 weeks.
Please let me know if this does not work for you or if you prefer one week over the other.
-Lee //Vraj Mehalana 17:50, 26 March 2025 (UTC)
Raith Velion UP
Raith service have replaced the interferometer laser, and the system is pumping down overnight. I'll run calibrations and checks tomorrow and expect the Velion to be open for general use on Wednesday morning. --Dan //Vraj Mehalana 22:27, 1 April 2025 (UTC)
New Gowns: Toolbelts purchases
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.
Two vendors for cleanroom belts we are using are listed here, you may request others:
- Uniform Technology Tool Belt - note the waist size, the 49” belt fits up to ~36-38” waist.
- HiTEC Fannypack
// Demis D. John 03:34, 3 January 2025 (UTC)
Suss SB6-8E
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.
I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)