Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(DSX up)
(velion update)
 
(35 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====PECVD#2 will remain down overnight=====
=====Raith Velion DOWN=====
The Raith Velion FIB tool is currently down while the AuGeSi source is replaced. Expected return to general use May 5th.
Unfortunately PECVD2 will remain down overnight.
// [[User:John_d|Demis D. John]] 18:22, 28 April 2025 (UTC)


===== SignupMonkey + Wiki: Off-Campus Access=====
The heater is unable to keep up with the setpoint while running.
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.


If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
Don and I replaced the heater controller without luck.


https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
I am cooling down the chamber overnight and we will look into the heater coil in the morning.
//[[User:Mehalana v|Vraj Mehalana]] 03:31, 25 February 2025 (UTC)


-- Vraj
=====Olympus DSX Microscope: UP=====
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)
I have installed a new head and tested it with no problems. Please let me know if you have any questions.
-- Tony Bosch
// [[User:John_d|Demis D. John]] 04:57, 25 February 2025 (UTC)

=====RIE #5 Down=====
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.

If we complete the job early we will send a follow-up email releasing the system.

//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC)

=====Stepper #3 (ASML DUV) - Maint moved to March 3rd=====
We have postponed the Periodic Maintenance (PM) to the week of Monday March 3rd.
Please plan your work accordingly.
// [[User:John_d|Demis D. John]] 19:44, 4 February 2025 (UTC)

=====Oxford ALD+Ion Mill: UP=====
The tool now runs all process temperatures (120-300c).
--Bill Millerski
UCSB
//[[User:John_d|Demis D. John]] 19:48, 4 February 2025 (UTC)


=====New Gowns: Toolbelts purchases=====
=====New Gowns: Toolbelts purchases=====

Latest revision as of 18:22, 28 April 2025

Raith Velion DOWN

The Raith Velion FIB tool is currently down while the AuGeSi source is replaced. Expected return to general use May 5th. // Demis D. John 18:22, 28 April 2025 (UTC)

SignupMonkey + Wiki: Off-Campus Access

Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj // Demis D. John 20:08, 22 April 2025 (UTC)

New Gowns: Toolbelts purchases

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.

Two vendors for cleanroom belts we are using are listed here, you may request others:

// Demis D. John 03:34, 3 January 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)