Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted old tools)
mNo edit summary
 
(23 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<startfeed />
<startfeed />
=====MLA150 is down=====
The FSE will be onsite tomorrow morning to begin working on the tool. I'll send out an email some time tomorrow once we have an idea of how long the repairs will take.


===== SignupMonkey + Wiki: Off-Campus Access=====
-Lee
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website, including both the Nanofab Wiki and Signupmonkey, except for users '''on campus using UCSB Wi-Fi or LAN'''.
//[[User:Mehalana v|Vraj Mehalana]] 18:59, 4 March 2025 (UTC)


If you are off-campus, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:
=====Stepper #3 (ASML DUV) - Maint =====
ASML Maintenance is complete, the system is up.
// [[User:John_d|Demis D. John]] 02:18, 7 March 2025 (UTC)


https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn
=====RIE #5 Down: Mon March 13th =====
RIE #5 will be down Monday March 13th through the end of Wednesday March 15th for maintenance.


This is hopefully a temporary solution, we will implement other remedies next week.
If we complete the job early we will send a follow-up email releasing the system.

-- Vraj
// [[User:John_d|Demis D. John]] 03:41, 5 April 2025 (UTC)

=====Unaxis Dep: DOWN=====
The computer is not coming up, after the campus-wide power outage last week. Will continue to work on it next week.
// [[User:John_d|Demis D. John]] 11:00, 4 April 2025 (UTC)

=====Fluorine ICP: UP=====
We finally got the slit valve assemble to seal correctly after making a number of mechanical adjustments. The tool is currently running an O2 clean and should be available to use within the next 10-15 minutes. Please let us know if you encounter any issues. The load lock seems like it's taking a while to get down to 0mT but that could just be a product of being open for the past several days.

Thanks,

Aidan
// [[User:John_d|Demis D. John]] 06:39, 3 April 2025 (UTC)

=====EVG - Scheduled downtime=====
I am looking at sending that generator on the week of March 24th or 31st. It should not take that long, but I would plan for it to be down for 3 weeks.

Please let me know if this does not work for you or if you prefer one week over the other.

-Lee
//[[User:Mehalana v|Vraj Mehalana]] 17:50, 26 March 2025 (UTC)


=====Raith Velion UP=====
//[[User:Mehalana v|Vraj Mehalana]] 09:46, 21 February 2025 (UTC)
Raith service have replaced the interferometer laser, and the system is pumping down overnight. I'll run calibrations and checks tomorrow and expect the Velion to be open for general use on Wednesday morning.
--Dan
//[[User:Mehalana v|Vraj Mehalana]] 22:27, 1 April 2025 (UTC)


=====New Gowns: Toolbelts purchases=====
=====New Gowns: Toolbelts purchases=====

Latest revision as of 15:24, 5 April 2025

SignupMonkey + Wiki: Off-Campus Access

Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website, including both the Nanofab Wiki and Signupmonkey, except for users on campus using UCSB Wi-Fi or LAN.

If you are off-campus, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

This is hopefully a temporary solution, we will implement other remedies next week.

-- Vraj // Demis D. John 03:41, 5 April 2025 (UTC)

Unaxis Dep: DOWN

The computer is not coming up, after the campus-wide power outage last week. Will continue to work on it next week. // Demis D. John 11:00, 4 April 2025 (UTC)

Fluorine ICP: UP

We finally got the slit valve assemble to seal correctly after making a number of mechanical adjustments. The tool is currently running an O2 clean and should be available to use within the next 10-15 minutes. Please let us know if you encounter any issues. The load lock seems like it's taking a while to get down to 0mT but that could just be a product of being open for the past several days.

Thanks,

Aidan // Demis D. John 06:39, 3 April 2025 (UTC)

EVG - Scheduled downtime

I am looking at sending that generator on the week of March 24th or 31st. It should not take that long, but I would plan for it to be down for 3 weeks.

Please let me know if this does not work for you or if you prefer one week over the other.

-Lee //Vraj Mehalana 17:50, 26 March 2025 (UTC)

Raith Velion UP

Raith service have replaced the interferometer laser, and the system is pumping down overnight. I'll run calibrations and checks tomorrow and expect the Velion to be open for general use on Wednesday morning. --Dan //Vraj Mehalana 22:27, 1 April 2025 (UTC)

New Gowns: Toolbelts purchases

We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase.

Two vendors for cleanroom belts we are using are listed here, you may request others:

// Demis D. John 03:34, 3 January 2025 (UTC)

Suss SB6-8E

We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests.

I will send out an update once we have one. -Aidan // Demis D. John 00:35, 8 December 2024 (UTC)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)