Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
Updated lab OPEN |
No edit summary |
||
(42 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday. |
|||
Sorry for any inconvenience this may cause. |
|||
=====Lab Open===== |
|||
Hello All, |
|||
Thanks |
|||
Following the campus-wide power shutoff, |
|||
Bill Millerski |
|||
The fab is open but the following equipment still has lingering issues: |
|||
⚫ | |||
Unaxis ICP-PECVD - Main computer is not coming up |
|||
ALD/CAIBE - All chambers down. Bill is still working on it. |
|||
Fluorine Etcher - Will remain down until it can be addressed Monday. |
|||
EB3 - Cryo regen failed, on second regen so should come up later. |
|||
GCA Autostep - Having computer issues. |
|||
The ALD/CABE and EB3 have a more than fair chance of coming back up today. Bill will have those updates along with the status of the Autostep. The Unaxis and Fluorine etcher will not be coming up until sometime next week at the earliest. |
|||
Best, |
|||
Tony Bosch |
|||
⚫ | |||
=====RIE #5 is up===== |
|||
We found a burnt wire in the system controller. System is ready to use. |
|||
⚫ | |||
=====EVG - Scheduled downtime===== |
|||
I am looking at sending that generator on the week of the 24th or 31st. It should not take that long, but I would plan for it to be down for 3 weeks. |
|||
Please let me know if this does not work for you or if you prefer one week over the other. |
|||
-Lee |
|||
//[[User:Mehalana v|Vraj Mehalana]] 17:50, 26 March 2025 (UTC) |
|||
⚫ | |||
There is a fault with the laser interferometer stage on the Raith Velion FIB. I have contacted Raith service for advice on how to proceed, I will send an update when I know more. The tool is down until further notice. |
|||
//[[User:Mehalana v|Vraj Mehalana]] 17:49, 26 March 2025 (UTC) |
|||
=====New Gowns: Toolbelts purchases===== |
|||
We are required to switch to new gowns in January. The new gowns won’t have pockets, but you are allowed to purchase cleanroom tool belts. Please ask staff for which tool belts you can purchase. |
|||
Two vendors for cleanroom belts we are using are listed here, you may request others: |
|||
* [https://www.terrauniversal.com/tool-belt-pocket-49in-waist-white-altessa-grid-uniform-technology-4954-60a.html Uniform Technology Tool Belt] - note the waist size, the 49” belt fits up to ~36-38” waist. |
|||
* [https://www.fishersci.com/shop/products/cleanroom-fannypack-1-ea-white/NC0723118?searchHijack=true&searchTerm=cleanroom-fannypack-1-ea-white&searchType=Rapid&matchedCatNo=NC0723118 HiTEC Fannypack] |
|||
// [[User:John_d|Demis D. John]] 03:34, 3 January 2025 (UTC) |
|||
=====Suss SB6-8E===== |
=====Suss SB6-8E===== |
||
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information. |
|||
We found a blown resistor (and a questionable op amp) on one of the boards that contains the z-axis motor circuit. However, we still cannot get the tool to initialize. Next we will try swapping out the hard drive again and run some more tests. |
|||
⚫ | |||
I will send out an update once we have one. |
|||
-Aidan |
|||
// [[User:John_d|Demis D. John]] 00:35, 8 December 2024 (UTC) |
|||
=====ICP1 Down===== |
=====ICP1 Down===== |
Latest revision as of 22:24, 13 August 2025
Oxford Flexal ALD
The PM is proceeding slower than expected. As such, I currently anticipate that the tool will be available for use by the end of the day on Friday.
Sorry for any inconvenience this may cause.
Thanks Bill Millerski //Vraj Mehalana 21:12, 12 August 2025 (UTC)
Suss SB6-8E
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact Demis D. John for more information. // Demis D. John 04:28, 5 August 2025 (UTC)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)