=====E-Beam #2 is down - Update=====
The replacement cyro pump had a leak in the N2 purge connection. After that was sorted out I was able to get the cryo going. However, it appears there is an issue with this cryo as it is pumping very slow. I am going to let it pump overnight but will most likely change it out in the morning. As of right now, no ETA on when the tool will be available.


=====Announcements moved=====
-Lee
Please check the <u>[https://signupmonkey.ece.ucsb.edu announcements in SignupMonkey]</u> for equipment notifications.
//[[User:Mehalana v|Vraj Mehalana]] 21:14, 4 August 2025 (UTC)
// [[User:John_d|Demis D. John]] 02:03, 27 November 2025 (UTC)
=====ALD: Chamber 1=====
I will be back on Thursday. In the meantime, the users can run the BDEAS recipe on the other chamber.
//[[User:Mehalana v|Vraj Mehalana]] 21:13, 4 August 2025 (UTC)

=====MLA Up=====
The MLA is up but unavailable for most of the day.
//[[User:Mehalana v|Vraj Mehalana]] 21:13, 4 August 2025 (UTC)

=====EBeam1 is UP=====
EBeam1 is back UP

Late this morning, the hoist motor was finally delivered, and as soon as it arrived I started the installation.
I then tested the Egun operation due to the new high voltage feed throughs that were installed earlier this week.

All tests were completed without issue. System UP.
// 04:23, 25 July 2025 (UTC)

===== SignupMonkey + Wiki: Off-Campus Access=====
Due to a DDoS attack affecting the Signupmonkey server, we have restricted access to the website to US locations only, including both the Nanofab Wiki and Signupmonkey.

If you are off-campus and experiencing issues, please utilize the UCSB VPN to access our sites. Here are the installation instructions for VPN on your device. You will need your UCSB NetID for download and installation - you would have received a UCSB NetID when you started using the NanoFab:

https://it.ucsb.edu/ivanti-secure-access-campus-vpn/get-connected-campus-vpn

-- Vraj
// [[User:John_d|Demis D. John]] 20:08, 22 April 2025 (UTC)

=====Suss SB6-8E=====
This tool is down indefinitely. We are sourcing manual bonding fixtures, and already have a 1cm bonding fixture for NanoFab users to use - please contact [[Demis D. John]] for more information.
// [[User:John_d|Demis D. John]] 04:28, 5 August 2025 (UTC)

=====ICP1 Down=====
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)


<!--
<!--

Latest revision as of 19:31, 5 February 2026

Announcements moved

Please check the announcements in SignupMonkey for equipment notifications. // Demis D. John 02:03, 27 November 2025 (UTC)