Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
(asml pm done) |
m (sig) |
||
Line 19: | Line 19: | ||
===== ASML Up ===== |
===== ASML Up ===== |
||
ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
||
[[User:John d| |
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
||
===== JEOL SEM #2 ===== |
===== JEOL SEM #2 ===== |
Revision as of 02:53, 11 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
ASML Up
ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2
Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)
Cary 500
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)