Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (cary down title)
(jeol sem up)
Line 25: Line 25:
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)


===== JEOL SEM #2 =====
===== JEOL SEM #2: Up =====
Problem with load lock gate valve. Currently down.
System is up, gate valve fixed.
// [[User:John d|John d]] ([[User talk:John d|talk]]) 16:01, 13 February 2018 (PST)
The service engineer from JEOL thinks he has fixed the gate valve
issue. Letting the system stabilize overnight and then run a
couple of tests in the morning. If all goes well the system should be
ready to use by late morning tomorrow.
// [[User:John d|Posted:]] 16:51, 12 February 2018 (PST)


===== Cary 500 Down =====
===== Cary 500 Down =====

Revision as of 00:01, 14 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2: Up

System is up, gate valve fixed. // John d (talk) 16:01, 13 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)