Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(icp1 dpwn, delete ASML) |
m (sig fix) |
||
Line 19: | Line 19: | ||
===== ICP#1: Down ===== |
===== ICP#1: Down ===== |
||
There is a problem with the backside He cooling. |
There is a problem with the backside He cooling. |
||
− | [[User:John d| |
+ | [[User:John d|Posted:]] 13:41, 14 February 2018 (PST) |
===== JEOL SEM #2: Down ===== |
===== JEOL SEM #2: Down ===== |
Revision as of 14:42, 14 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
ICP#1: Down
There is a problem with the backside He cooling. Posted: 13:41, 14 February 2018 (PST)
JEOL SEM #2: Down
Load Lock problem. // Posted: 13:40, 14 February 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)