Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(lab open, deleted exhaust shutdown) |
||
Line 8: | Line 8: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== Lab is OPEN ===== |
|||
Campus facilities finished the exhaust fan install sooner than expected. Cleanroom exhaust is up and running and the lab is safe to enter. |
|||
⚫ | |||
===== Suss Bonder ===== |
===== Suss Bonder ===== |
||
Line 17: | Line 20: | ||
[[User:Silva|Silva]] 07:15, 2 May 2019 (PDT) |
[[User:Silva|Silva]] 07:15, 2 May 2019 (PDT) |
||
===== Lab Shutdown for Exhaust Fan Installation===== |
|||
The cleanroom will be DOWN from 7am to ~1pm on Friday, May 24th. An email will be sent out once the lab is back up and running. |
|||
⚫ | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
Revision as of 16:37, 24 May 2019
Equipment Status
Lab is OPEN
Campus facilities finished the exhaust fan install sooner than expected. Cleanroom exhaust is up and running and the lab is safe to enter. // John d 09:37, 24 May 2019 (PDT)
Suss Bonder
Suss Bonder is DOWN. Suss field service is sourcing replacement parts for the bonder repair. An update will be sent out once we have a date scheduled for the service. Silva 10:45, 12 April 2019 (PDT)
SLR Fluorine ICP Etch
The system will be down May 23 and May 24, 2019 to integrate a new maglev turbo pump. Silva 07:15, 2 May 2019 (PDT)