===== ASML is DOWN ===== |
===== ASML is DOWN: Repair Expected Monday ===== |
||
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th. |
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th. |
||
// [[User:John d|John d]] 12:33, 2 January 2020 (PST) |
// [[User:John d|John d]] 12:33, 2 January 2020 (PST) |
Revision as of 20:33, 2 January 2020
Equipment Status
ASML is DOWN: Repair Expected Monday
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th. // John d 12:33, 2 January 2020 (PST)
Unaxis ICP-PECVD
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)
Suss Bonder
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)