Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML down)
(ASML up)
Line 10: Line 10:
<!------------- Equipment Status ---------------->
<!------------- Equipment Status ---------------->


===== ASML is DOWN =====
===== ASML is UP =====
Laser Gas Fill error - investigating.
Laser Gas Fill enabled. System calibrated, ready for use.
// [[User:John d|John d]] 08:13, 13 January 2020 (PST)
// [[User:John d|John d]] 09:27, 13 January 2020 (PST)


===== Unaxis ICP-PECVD =====
===== Unaxis ICP-PECVD =====

Revision as of 17:27, 13 January 2020

Equipment Status


ASML is UP

Laser Gas Fill enabled. System calibrated, ready for use. // John d 09:27, 13 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)