Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(SUM testing feb 7)
Line 14: Line 14:
// [[User:John d|John d]] 23:04, 29 January 2020 (PST)
// [[User:John d|John d]] 23:04, 29 January 2020 (PST)


===== N2 Dry Box Cleanout, February 7th =====
===== N2 Dry Box Cleanout, February 14th =====
We will be cleaning out the N2 dry box in bay 6. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns.
We will be cleaning out the large N2 dry box next to the ASML. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns.
[[User:Hopkins a|Hopkins a]] 16:07, 23 January 2020 (PST)
[[User:Hopkins a|Hopkins a]] 16:07, 23 January 2020 (PST)


===== ASML Maintenance: March 30th =====
===== ASML Maintenance: March 30th =====

Revision as of 18:27, 10 February 2020

Equipment Status


SignupMonkey Testing: Fri Feb 7th, 7am

We will be running tests on the SignupMonkey servers at 7am on Friday Feb. 7th. This may cause temporary outages of the server at this time. // John d 23:04, 29 January 2020 (PST)

N2 Dry Box Cleanout, February 14th

We will be cleaning out the large N2 dry box next to the ASML. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns. Hopkins a 16:07, 23 January 2020 (PST)

ASML Maintenance: March 30th

ASML periodic maintenance will be on Monday March 30th, system will be down for up to 1.5 weeks. // John d 07:30, 27 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)