Template:Announcements: Difference between revisions
(GCA 6300 PM update) |
(SEM#1 UP) |
||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== SEM#1 (FEI): |
===== SEM#1 (FEI): UP ===== |
||
The field service engineer has finished with the alignments and the system is ready to use. |
|||
The new filament failed during its ramp up. Another new filament should be here later this week. |
|||
// [[User:John d|John d]] |
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT) |
||
===== GCA AutoStep Service ===== |
===== GCA AutoStep Service ===== |
Revision as of 21:27, 21 September 2022
Important Announcements
SEM#1 (FEI): UP
The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)
GCA AutoStep Service
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.
// John d 08:30, 19 September 2022 (PDT)
GCA 6300 Service
GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.
// John d 08:33, 19 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.
// John d 01:53, 17 September 2022 (PDT)