Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(JEOL SEM UP) |
||
Line 22: | Line 22: | ||
// [[User:John d|John d]] 14:12, 9 November 2022 (PST) |
// [[User:John d|John d]] 14:12, 9 November 2022 (PST) |
||
===== JEOL SEM is |
===== JEOL SEM is UP ===== |
||
System ready for use. |
|||
A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm. |
|||
//[[User:Hopkins a|Hopkins a]] |
//[[User:Hopkins a|Hopkins a]] 12:54, 11 November 2022 (PST) |
||
===== Au Plating: DOWN ===== |
===== Au Plating: DOWN ===== |
Revision as of 15:48, 15 November 2022
Important Announcements
Fri Nov 11: Holiday
Fri Nov 11th is a UCSB Holiday (Veteran's Day). Staff will not be on site. // John d 07:35, 11 November 2022 (PST)
EVG Down
Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info. // John d 14:12, 9 November 2022 (PST)
JEOL SEM is UP
System ready for use. //Hopkins a 12:54, 11 November 2022 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)