Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(blue-M oven down)
No edit summary
Line 36: Line 36:
Bath damaged, system is down for repair.
Bath damaged, system is down for repair.
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)

==== Oxford Cobra ICP Etch ====
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair.
[[User:Silva|Silva]] 07:23, 25 January 2023 (PST)


<!---------- end of Equipment Status ------------>
<!---------- end of Equipment Status ------------>

Revision as of 15:23, 25 January 2023

Important Announcements


Blue-M oven: Down

BlueM down until further notice. Looking into blown fuse issues. // John d 15:37, 19 January 2023 (PST)

Stepper #1 GCA 6300: maintenance

This tool has been scheduled for maintenance and will be unavailable for the following dates/times:

1-23-23 12:00pm till 1-23-23 5:00pm 1-26-23 8:00am till 1-27-23 8:00am // John d 15:01, 19 January 2023 (PST)

Stepper #2 AUtostep200: maintenance

This tool has been scheduled for maintenance and will be unavailable for the following dates/times:

1-23-23 8:00am till 1-23-23 12:00pm 1-24-23 8:00am till 1-26-23 8:00am // John d 15:35, 19 January 2023 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

Oxford Cobra ICP Etch

ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Silva 07:23, 25 January 2023 (PST)