Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
(blue-m oven UP) |
(deleted GCA maintenance) |
||
Line 22: | Line 22: | ||
Now available for use. |
Now available for use. |
||
// [[User:John d|John d]] 00:52, 27 January 2023 (PST) |
// [[User:John d|John d]] 00:52, 27 January 2023 (PST) |
||
===== Stepper #1 GCA 6300: maintenance ===== |
|||
This tool has been scheduled for maintenance and will be unavailable for the following dates/times: |
|||
1-23-23 12:00pm till 1-23-23 5:00pm |
|||
1-26-23 8:00am till 1-27-23 8:00am |
|||
// [[User:John d|John d]] 15:01, 19 January 2023 (PST) |
|||
===== Stepper #2 AUtostep200: maintenance ===== |
|||
This tool has been scheduled for maintenance and will be unavailable for the following dates/times: |
|||
1-23-23 8:00am till 1-23-23 12:00pm |
|||
1-24-23 8:00am till 1-26-23 8:00am |
|||
// [[User:John d|John d]] 15:35, 19 January 2023 (PST) |
|||
===== Au Plating: DOWN ===== |
===== Au Plating: DOWN ===== |
Revision as of 08:54, 27 January 2023
Important Announcements
Dektak XT in qualification
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. // John d 10:39, 25 January 2023 (PST)
Blue-M oven: UP
Oven reassembled and tested. Now available for use. // John d 00:52, 27 January 2023 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
Oxford Cobra ICP Etch
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will be shipping the parts we need for repair on Friday. Hopefully they will arrive Monday and the system will be operational Tuesday afternoon. I will update you all if that schedule changes. // John d 09:50, 26 January 2023 (PST)