Template:Announcements: Difference between revisions
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair===== |
|||
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis |
|||
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT) |
|||
=====MA6 TSA is down - Update===== |
=====MA6 TSA is down - Update===== |
||
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something. |
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something. |
Revision as of 20:42, 9 May 2024
Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
//Vraj Mehalana 13:42, 9 May 2024 (PDT)
MA6 TSA is down - Update
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
//Vraj Mehalana 11:15, 1 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ASML optics replacement May 20th-22nd
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
//Vraj Mehalana 09:40, 9 May 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)