Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(annoucnements: 11/28 gas shutdown)
 
m (commented)
Line 8: Line 8:
* Delete the old announcement, and replace with your new announcement
* Delete the old announcement, and replace with your new announcement
* NO user signature is required for this template since only one or two items will ever be shown.
* NO user signature is required for this template since only one or two items will ever be shown.
* If you do need items to be shown in chronological order, then you must add a user signature at the end of each post via four tildes: ~~~~
* If you do need items to be shown in chronological order, then you must add a user signature at the end of each post via four tildes: ~~~~, then delete the name after the two dashes "--" and delete the "[[(talk)...]]" link
-->
-->




<!-- Announcements -->
<!--------- Announcements ---------->
=== Announcements ===
=== Announcements ===
There will be a gas shutdown Thursday Nov. 30th from 8 am to 11 am that will affect RIE 3, ALD Dielectric chamber and the ALD ion mill.  An email will be sent once the work is finished.
There will be a gas shutdown Thursday Nov. 30th from 8 am to 11 am that will affect RIE 3, ALD Dielectric chamber and the ALD ion mill.  An email will be sent once the work is finished.
[[User:John d|-- Demis]] ([[User talk:John d|talk]]) 10:37, 28 November 2017 (PST)
[[User:John d|-- ]] 10:37, 28 November 2017 (PST)
<!------ end of announcements ------->
<endfeed />
<endfeed />
<noinclude>[[Category:Templates]]</noinclude>
<noinclude>[[Category:Templates]]</noinclude>

Revision as of 18:39, 28 November 2017

Current NanoFab announcements.


Announcements

There will be a gas shutdown Thursday Nov. 30th from 8 am to 11 am that will affect RIE 3, ALD Dielectric chamber and the ALD ion mill.  An email will be sent once the work is finished. -- 10:37, 28 November 2017 (PST)