Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(asml pm done)
m (sig)
Line 19: Line 19:
===== ASML Up =====
===== ASML Up =====
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
[[User:John d|John d]] ([[User talk:John d|talk]]) 18:52, 10 February 2018 (PST)
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)


===== JEOL SEM #2 =====
===== JEOL SEM #2 =====

Revision as of 02:53, 11 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2

Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)

Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)