Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
m sig fix |
→JEOL SEM #2: Up: down |
||
| Line 25: | Line 25: | ||
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
||
===== JEOL SEM #2: |
===== JEOL SEM #2: Down ===== |
||
Load Lock problem. |
|||
System is up, gate valve fixed. |
|||
// [[User:John d| |
// [[User:John d|John d]] ([[User talk:John d|talk]]) 13:40, 14 February 2018 (PST) |
||
===== Cary 500 Down ===== |
===== Cary 500 Down ===== |
||
Revision as of 21:40, 14 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
ASML: Up
ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2: Down
Load Lock problem. // John d (talk) 13:40, 14 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)