===== LAB CLOSED for 1 hr on Monday =====
===== Lab Re-Opened =====
Maintenance is complete.
The lab will be down from 7:30am to 8:30am on Monday, June 11th so campus facilities can install a new controller for the cleanroom air handlers. This should be a pretty quick and easy procedure but as a precautionary measure no one will be allowed in the lab at this time. We will send out an email as soon as the lab is safe to enter. Please plan accordingly and let me know if you have any questions.
// [[User:John d|John d]] 11:45, 7 June 2018 (PDT)
// [[User:John d|John d]] 16:14, 11 June 2018 (PDT)


===== AFM Down =====
===== AFM Down =====
The laser/laser focus is struggling on the AFM. I will be removing
The laser/laser focus is struggling on the AFM. I will be removing the head and taking it to Bruker for a tune-up/repair this afternoon. The system will be down until some time this week.
the head and taking it to Bruker for a tune-up/repair this afternoon
. The system will be down until some time next week.
// [[User:John d|John d]] 11:07, 8 June 2018 (PDT)
// [[User:John d|John d]] 11:07, 8 June 2018 (PDT)


===== Solvent Bench Bay 7 - Heated Bath =====
===== Solvent Bench Bay 7 - Heated Bath =====
I have disabled the auto refill due to a high water level. There is however a manual fill and a manual drain button at the center top of the head case. It was the old fill and drain for the ultrasonic sink that was once in the bench. So users using the bath might need to fill or drain as you put your beaker in. Please be careful with other user's beakers.
We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers.
// [[User:John d|John d]] 17:18, 6 June 2018 (PDT)
// [[User:John d|John d]] 17:18, 6 June 2018 (PDT)


Line 27: Line 25:
gas panel. We will notify you when the gas is available.
gas panel. We will notify you when the gas is available.
// [[User:John d|John d]] 17:00, 4 June 2018 (PDT)
// [[User:John d|John d]] 17:00, 4 June 2018 (PDT)

===== DSEIII =====
Wafer recovered, system up.
// [[User:John d|John d]] 09:33, 8 June 2018 (PDT)


===== PECVD#2 is Up =====
===== PECVD#2 is Up =====

Revision as of 23:14, 11 June 2018

UCSB NanoFab Announcements

Lab Re-Opened

Maintenance is complete. // John d 16:14, 11 June 2018 (PDT)

AFM Down

The laser/laser focus is struggling on the AFM. I will be removing the head and taking it to Bruker for a tune-up/repair this afternoon. The system will be down until some time this week. // John d 11:07, 8 June 2018 (PDT)

Solvent Bench Bay 7 - Heated Bath

We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers. // John d 17:18, 6 June 2018 (PDT)

RIE#5: No SiCl4

We have received a new bottle of SiCl4 and we are installing a new gas panel. We will notify you when the gas is available. // John d 17:00, 4 June 2018 (PDT)

PECVD#2 is Up

The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. All users need retraining on the new software. Contact Mike Silva for training. // Thibeault 17:25, 24 May 2018 (PDT)