Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
m (added comments with RSS feed URLs) |
No edit summary |
||
Line 20: | Line 20: | ||
The system is down. The lead time for the replacement turbo pump is three weeks. |
The system is down. The lead time for the replacement turbo pump is three weeks. |
||
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST) |
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST) |
||
===== SUSS MA6 ===== |
|||
The system is down. The vendor is coming to PM the system and look at the lamp power supply. |
|||
[[User:Silva|Silva]] 09:25, 5 February 2019 (PST) |
|||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:25, 5 February 2019
Equipment Status
Suss Bonder
The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)
KLA Tencor Surfscan
The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)
ALD Metal Dep
The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)
SUSS MA6
The system is down. The vendor is coming to PM the system and look at the lamp power supply. Silva 09:25, 5 February 2019 (PST)