Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (update ASML title)
(asml update)
Line 11: Line 11:


===== ASML is DOWN: Repair Expected Monday =====
===== ASML is DOWN: Repair Expected Monday =====
Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th.
Parts on order for Level Sensor lamp assembly replacement, will likely get an ASML technician on site on Monday Jan 6th.
// [[User:John d|John d]] 12:33, 2 January 2020 (PST)
// [[User:John d|John d]] 14:14, 2 January 2020 (PST)


===== Unaxis ICP-PECVD =====
===== Unaxis ICP-PECVD =====

Revision as of 22:14, 2 January 2020

Equipment Status


ASML is DOWN: Repair Expected Monday

Parts on order for Level Sensor lamp assembly replacement, will likely get an ASML technician on site on Monday Jan 6th. // John d 14:14, 2 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)