<!------------- Equipment Status ---------------->


===== ASML is DOWN: Repair Expected Monday =====
===== ASML is UP =====
System is up, calibrated and ready for use.
Parts on order for Level Sensor lamp assembly replacement, will likely get an ASML technician on site on Monday Jan 6th.
// [[User:John d|John d]] 14:14, 2 January 2020 (PST)
// [[User:John d|John d]] 10:00, 9 January 2020 (PST)


===== Unaxis ICP-PECVD =====
===== Unaxis ICP-PECVD =====

Revision as of 18:00, 9 January 2020

Equipment Status


ASML is UP

System is up, calibrated and ready for use. // John d 10:00, 9 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)