Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Vet day holiday)
(deleted ASML msgs, MLA150 msg)
Line 25: Line 25:
A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm.
A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm.
//[[User:Hopkins a|Hopkins a]] 08:12, 8 November 2022 (PST)
//[[User:Hopkins a|Hopkins a]] 08:12, 8 November 2022 (PST)

===== ASML UP =====
PM complete, system is up.
// [[User:John d|John d]] 13:25, 4 November 2022 (PDT)


===== Au Plating: DOWN =====
===== Au Plating: DOWN =====
Line 37: Line 33:
EB2 Heated Processing is down
EB2 Heated Processing is down
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)

===== MLA 150 Software Revision =====
The MLA has new software - make sure to see the updated operating procedures.
In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details.
// [[User:John d|John d]] 16:27, 17 October 2022 (PDT)

===== ASML Up; Network status =====

Nanofiles sync & JobCreator functionality is in the process of being restored.
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)


===== NanoFab Job Openings =====
===== NanoFab Job Openings =====

Revision as of 15:35, 11 November 2022

Important Announcements


Fri Nov 11: Holiday

Fri Nov 11th is a UCSB Holiday. Staff will not be on site. // John d 07:35, 11 November 2022 (PST)

EVG Down

Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info. // John d 14:12, 9 November 2022 (PST)

JEOL SEM is Down

A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm. //Hopkins a 08:12, 8 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)