Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleete veterans day)
Line 13: Line 13:
<!---------------------------------------------->
<!---------------------------------------------->
<!------------- Equipment Status ---------------->
<!------------- Equipment Status ---------------->

===== EVG Down =====
Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info.
// [[User:John d|John d]] 14:12, 9 November 2022 (PST)


===== JEOL SEM is UP =====
===== JEOL SEM is UP =====

Revision as of 17:12, 17 November 2022

Important Announcements


JEOL SEM is UP

System ready for use. //Hopkins a 12:54, 11 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)