Template:Announcements: Difference between revisions

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML Down: laser fail)
(asml up)
Line 14: Line 14:
<!------------- Equipment Status ---------------->
<!------------- Equipment Status ---------------->


===== ASML: Down for Laser Hardware Failure =====
===== ASML: UP =====
System is repaired and up for use.
The DUV Laser has a failed component, we are awaiting parts for repair.
// [[User:John d|John d]] 06:53, 13 December 2022 (PST)
// [[User:John d|John d]] 14:25, 14 December 2022 (PST)


===== Au Plating: DOWN =====
===== Au Plating: DOWN =====

Revision as of 22:25, 14 December 2022

Important Announcements


ASML: UP

System is repaired and up for use. // John d 14:25, 14 December 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater UP

We tested the heater to 680°C three times without any issues. There is still the issue with the temp controller not communicating with the software which will get sorted out eventually. In the meantime you will just change the temp using the controller, directions are posted at the tool. // John d 15:55, 6 December 2022 (PST)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)