Template:Announcements: Difference between revisions
(jeol sem down) |
|||
Line 13: | Line 13: | ||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
===== JEOL SEM#2: Down ===== |
|||
After troubleshooting the system with JEOL we’ve determined that the leak is most likely in the gate valve. JEOL is arranging to have a service engineer be out here early next week. We’ll have an update on Monday. -- Aidan |
|||
// [[User:John d|John d]] 19:04, 29 January 2023 (PST) |
|||
===== MLA Service: Monday Jan 30th 5:30pm ===== |
===== MLA Service: Monday Jan 30th 5:30pm ===== |
Revision as of 21:10, 4 February 2023
Important Announcements
MLA Service: Monday Jan 30th 5:30pm
The MLA will be down beginning on Monday 1/30 at 5:30 pm and the tool will be unavailable until around 5 pm the following day (Tuesday 1/31). HIMT needs to have Germany remote into the tool that evening to address the software issues we have been having. I will send an email out on Tuesday once the tool is available.
-Lee // John d 13:46, 27 January 2023 (PST)
Flip-Chip Bonder repair
All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony // John d 15:05, 27 January 2023 (PST)
Suss Bonder SB6 Down
We have fixed the top heater issue and now need to run some pressure and voltage tests. The system will be available Monday late morning if everything looks good. I’ll send out an email once the tool is back up. -- Aidan // John d 13:48, 27 January 2023 (PST)
Dektak XT in qualification
We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. // John d 10:39, 25 January 2023 (PST)
Blue-M oven: UP
Oven reassembled and tested. Now available for use. // John d 00:52, 27 January 2023 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
Oxford Cobra ICP Etch
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will have an engineer here next week (mid week) with the hopes of getting the system operational again. With any luck the system will be released by Friday Feb. 3rd afternoon. // John d 15:03, 27 January 2023 (PST)