Template:Announcements: Difference between revisions
Jump to navigation
Jump to search
Mehalana v (talk | contribs) No edit summary |
|||
Line 17: | Line 17: | ||
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony |
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony |
||
// [[User:John d|John d]] 09:35, 13 February 2023 (PST) |
// [[User:John d|John d]] 09:35, 13 February 2023 (PST) |
||
===== Flip-Chip Bonder is UP===== |
|||
Great news, the Finetech is up and running with both the 50x50 and 10x100 heating plates -- Tony Bosch |
|||
//[[User:Mehalana v|Vraj Mehalana]] 11:05, 2 March 2023 (PST) |
|||
===== Dektak XT ready for training ===== |
===== Dektak XT ready for training ===== |
Revision as of 18:45, 8 March 2023
Important Announcements
Unaxis Etch: Down
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony // John d 09:35, 13 February 2023 (PST)
Dektak XT ready for training
We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please contact the tool supervisor. // John d 10:08, 7 February 2023 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)