Template:Announcements

From UCSB Nanofab Wiki
Revision as of 00:01, 14 February 2018 by John d (talk | contribs) (sig fix)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

ASML: Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2: Up

System is up, gate valve fixed. // Posted: 16:01, 13 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)