Template:Announcements

From UCSB Nanofab Wiki
Revision as of 02:52, 11 February 2018 by John d (talk | contribs) (asml pm done)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. John d (talk) 18:52, 10 February 2018 (PST)

JEOL SEM #2

Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)

Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)