Template:Announcements
Jump to navigation
Jump to search
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
ASML Up
ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2
Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)
Cary 500
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)