Template:Announcements
Jump to navigation
Jump to search
UCSB NanoFab Announcements
RIE#5: SiCl4 Up
SiCl4 gas is available again on RIE #5. The maximum flow rate is 10 sccm. // John d 16:17, 12 June 2018 (PDT)
AFM Down
The laser/laser focus is struggling on the AFM. We have taken the AFM head to Bruker for a tune-up/repair. The system will be down until some time this week. // John d 16:17, 12 June 2018 (PDT)
Solvent Bench Bay 7 - Heated Bath
We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers. // John d 17:18, 6 June 2018 (PDT)