Lift-Off with DUV Imaging + PMGI Underlayer

From UCSB Nanofab Wiki
Revision as of 05:15, 7 September 2019 by John d (talk | contribs)
Jump to navigation Jump to search

This process is intended for Deep-UV Exposure on the ASML DUV Stepper. PMGI is used as the underlayer, which is exposed at the same time as the imaging resist.

This process uses PMGI SF-5 @ 4krpm, which spins to about 130nm (maximum metal thickness = 130nm/3 ≈ 45nm) and undercuts laterally about 130-140nm (minimum gap between metals = (2 x 140nm) + 30nm ≈ 350nm).

Tips

Please see our [Bi-Layer Lift-Off Tutorial] to understand the limitations and requirements for good lift-off.

  • Remember that gaps in between adjacent metal traces can lift-off during the develop!
  • Need underlayer thickness 2x to 3x the desired metal thickness.
  • The underlayer will develop laterally from both sides which can lift-off the imaging resist, so:
    • Minimum gap between adjacent metals should then be: less than 0.5 * underlayer thickness
    • Want at least 30-50nm of underlayer width left to support the imaging resist, so the PR doesn't fall over/collapse.
  • Make sure to use a vertical evaporation - EBeam4 or EBeam1. EBeam3 is not vertical.


Suggested Process for Liftoff

  • De-H2O Bake (eg. 220°C, 1m+). Optionally Oxygen ash instead.
  • HMDS soak 10s+
  • Spin PMGI SF-5 @ 4krpm (rcp 7)
    • --> POLOS underside clean: 2000rpm, ACE/ISO/N2
  • PMGI-Bake: 220°C, 3min (BrewerSci lift-pin hotplate).
    • Recipe "00 220deg, 3min Vac". Enable Vacuum with overhead valve, only for wafer landing and then turn off.
  • Spin UV-6-0.8 @ rcp 6 (3.5krpm)
    • --> POLOS underside clean: 2000rpm, ACE/ISO/N2
  • Soft-Bake = 135°C, 1min (builtin hotplate)
  • (check underside for particulates)
  • ASML Exposure
    • -- Default: Exp = 37.5mJ // foc = –0.10
  • (Try this exposure dose - might need to do a FocArray (smaller Image Distribution eg. 5x5) to find proper exposure.
  • PEB = 135°C, 1.5min (built-in hotplate)
  • Dev (300MiF) = 50sec (CRITICAL time)
    • --> with cassette & H2O dish prepared
    • --> not stirring, instead very slow/gentle lift/drop at various angles or gentle swish
  • DI rinse : very Gently! Dunk into prepared DI dish, and dump/fill gently 2x. Don’t allow direct hard water to hit PR surface.
  • PEii Technics O2: 30sec. May increase feature openings.
  • Metal Evaporation - EBeam#4 or EBeam#1 vertical/4-inch holder
  • Lift-off in NMP, facing down or vertical.


Examples