Important Announcements


EVG Down

Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info. // John d 14:12, 9 November 2022 (PST)

JEOL SEM is Down

A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm. //Hopkins a 08:12, 8 November 2022 (PST)

ASML UP

PM complete, system is up. // John d 13:25, 4 November 2022 (PDT)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

MLA 150 Software Revision

The MLA has new software - make sure to see the updated operating procedures. In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. // John d 16:27, 17 October 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// John d 15:44, 29 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)