Template:Announcements
Important Announcements
EVG Down
Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info. // John d 14:12, 9 November 2022 (PST)
JEOL SEM is Down
A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm. //Hopkins a 08:12, 8 November 2022 (PST)
ASML UP
PM complete, system is up. // John d 13:25, 4 November 2022 (PDT)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Software Revision
The MLA has new software - make sure to see the updated operating procedures. In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. // John d 16:27, 17 October 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)